We have five stone built buildings on our land, plus a couple of sheds, as well as a range of wood and tin barns. Our original plan when moving to Wales in the summer of 2013, was to focus on the main house first, and once that was done, we’d work on sorting out our field and building a shower and toilet block to offer a camping retreat, and a retirement income for us. But in February 2015, the front of the byre attached to the house came down in a storm and the tin roof blew away, exposing the delicate, fragile roof timbers.

 Our plans had to change, we threw all our time and money into saving the byre. Once the builders had left, it was down to us to lime mortar the walls, inside and out, and then begin applying the layers of lime wash that keep the building watertight.

After last week’s flooding, and water coming up into our lounge, we’ve backed off from our plans to complete our growing room, to grow vegetables throughout the year, and switched our focus to finishing lime washing the byre, and lime mortaring and repairing the kitchen and lean to at the back of the house, ready for the winter. This later extension wasn’t built as well as the main house, so we’re going to need to dismantle the stones above the kitchen window and rebuild it, but this weekend, we made a start.

There was a lot of rain in Wales over the weekend, so I didn’t manage as much as I’d hoped. The front of the byre has another coat of lime wash. Lime mortaring the end kitchen wall is underway. I’ll need a dry day to lime mortar the back wall, as dripping off the tin roof makes it impossible.

While the rain poured down, I weeded and cleared the last remnants from our raised beds and covered with cardboard, weighed down with stones. My partner, Mike, has some of the framework up on the inside of the lean to, ready to take the new roof panels, but we can’t take the old roof of until we can see two dry days in the forecast…we might have to wait a while.

It’s been a busy weekend, but a frustrating one in so many respects, as the rain and the daylight leaving so early have thwarted much of what we hoped to achieve. Join me again for more updates, as we renovate and repurpose our land, here on our little hillside in mid Wales.

The Wheel turns. Everything changes Part 1

Standard

Nothing stays the same. The Wheel turns and all those plans go out the window. On the 14th June, a phone call from my daughter in Essex changed the course of my life for the foreseeable future – she wanted to leave Essex and come and live with us in Wales.

It wasn’t an unpleasant surprise, just an unexpected one, and her arrival that evening, distressed and upset that her relationship in Essex was over, was the beginning of my sleepless nights, but to survive, one must adapt. I’ve always believed being flexible with arrangements and filling life with new adventures is a way to keep young, so we made a plan to renovate a room upstairs in our house for her, and we would collect her from Essex on 3rd August. Somehow, we needed to turn a room from  a barn-like, cobwebby mess into a welcoming room in just over a month.

It was a daunting task, especially as we were still working at our day jobs (my partner lays and sands wood floors, while I was teaching dance and writing my tenth novel), but we set to, clearing the room and sorting boxes and suitcases. My Mum died four years ago, and much of the sorting involved going through boxes from her house, so this wasn’t just a physical task, but an emotional, draining one too.

But looking back, remembering, grieving and looking forward is good for the soul. We were sorting our house for one of our precious children to live with us. It was a good kind of sadness, and we burned a lot of unwanted rubbish on our Midsummer bonfire, thinking of Mum and how happy she would have been that her grandchild was coming to live with us.

While my partner concentrated on getting the insulation, board and plastering fixed to our wobbly ceiling, I started work on the lime mortaring.

There weren’t enough hours in the day, but I made time to make fresh, whole food plant based meals which kept our energy levels up, and gave us a chance of completing our task on time. (We had our son’s wedding on 30th July in Rugby which took up three days – see Part 2 coming soon) Once my partner had plastered the ceiling, I switched tasks often between lime mortaring and painting, and then applying the coats of lime wash to the newly mortared walls. The scaffolding was too wobbly for me but I used steps and step ladders to reach almost to the appex and my partner finished the rest.

The other room upstairs also needed to be cleared,

and my partner was playing a gig at a birthday party, Tribal Unity were dancing at a steampunk weekend in Blaenavon and we were both performing at the Lampeter Food Festival. We worked late into the evenings.

Finally, we arrived at the days before we needed to go and collect our daughter, three cats, a rabbit and all her possessions. We pulled back the old lino to reveal the wooden floor.  

There was only time for one buff and coat on the floor as we needed to furnish the room, but apart from a wobbly board and a few repairs to do, it came up beautifully. I made a curtain from some new sparkly organza that was given to me, and a seat cushion, cover made from a new cream curtain. With the bed and a chair, it was beginning to look more welcoming. The room had a new door, but we ran out of time to finish the panelling and had to put a dustsheet back up. Chests of drawers and a hanging rail were accompanied by rugs and bedding, and the room was finished to the best of our ability in the time allotted.

Our daughter loves her room, the bunny likes her home in the byre and the cats are getting used to being part of a bigger cat family. The angst of the past weeks is over, and we’re all looking ahead to new beginnings.

If we’d still been smoking, I don’t believe we’d have had the capacity to keep working at this pace for so long, and the good, wholesome food really helped too. There were sacrifices (see Part 3 coming soon) but those things in life that are worth working for often require compromise.

We’re all enjoying the sunshine, catching up on outdoor jobs and looking forward to new exciting projects next year.

Thatching is finished!

Standard

It’s been a long wait…our scaffolding has been up for a year but we finally have a roof. It’s not quite watertight up there yet though as the walls still need to be build up at the ends of the house to meet the roof…DSC_1334but we are close!

The thatchers laid a wooden frame over the new commoon rafters and new gorse DSC_1347Then thatched over the frame…DSC_1350The scaffolding is a brilliant place to get a phone signal!…DSC_1352 The ridge is begun…DSC_1354 before work starts at the back of the house…DSC_1356 My partner had to construct the frames to hold the new conservation skylights…14 inches above the roof! DSC_1364Thatching of the back of the house begins…DSC_1367

It’s been a long, tiring, messy process. We’ve argued with planning department, tussled with Listing and battled with the thatcher but finally, we are the proud owners of a Welsh, thatched, 18th Century Farmhouse.